Line 5: Line 5:


==Standard PS1 documentation==
==Standard PS1 documentation==
<div class="toccolours mw-collapsible">
<div class="toccolours mw-collapsible mw-collapsed">


===Assistrail===
===Assistrail===
Line 46: Line 46:
*75mm concrete edge distance will always be achievable onsite unless specifically stated meaning we can use Concrete screws unless reduced edge distance(50mm) is required
*75mm concrete edge distance will always be achievable onsite unless specifically stated meaning we can use Concrete screws unless reduced edge distance(50mm) is required
*Stainless Steel 180mm Coach screws in all timber areas with SS washer & Nylon separation washer
*Stainless Steel 180mm Coach screws in all timber areas with SS washer & Nylon separation washer
*All “handrails” and top rails to be 32nb
*Some situations where any standalone 1100mm high barriers are (Ie. Between canopy poles) could be 40nb top rail
*No closure bend/stop starts on parallel deck rails, always ensure end to end in one complete run wherever practical
*No handrails (AR150) to be attached to building cladding unless this is explicitly shown on plans/marked up drawings, AR10 (Stanchion mounted handrail) is the minimum requirement


=Green Rule=


=Green Rule=
For at least on end of the pipe, the sum of the tail and bend length (X+Y) must be at least 300mm, otherwise add 200mm green. Any tail (X) must be a minimum of 80mm, otherwise add 200mm green.


When the sum of the Bend length, and straight on the end of bent pipe is 300mm or less; Add 200mm green. Should the straight end of bent pipe is 80mm or less, add 200mm green
[[File:NZGREEN.png|200px]]

Latest revision as of 22:33, 10 December 2025

PS1 Documentation[edit]

An PS1 is an engineering document that's required for all Moddex Product for New Zealand. There are PS1's available to view on the NZ One Drive, or in some cases a specific PS1 is made for an project.

Should you require a PS1 for a project, it will be mentioned in the original handover

Standard PS1 documentation[edit]

Assistrail[edit]

Tuffrail[edit]

Conectabal[edit]

Bikesafe[edit]

Kliptread[edit]

MOE Type Work Design Intent/Shop Drawings SOP[edit]

Please ensure the following points are reviewed & adhered to when reviewing MOE Type Shop drawings designs, anything not inline with these SOP’s please have Drafting team revise prior sending DI for client approval.

  • 4 hole baseplates by default unless told otherwise
  • No Chemical Anchors-only use HDG 12mm screw bolt for concrete fixings
  • 75mm concrete edge distance will always be achievable onsite unless specifically stated meaning we can use Concrete screws unless reduced edge distance(50mm) is required
  • Stainless Steel 180mm Coach screws in all timber areas with SS washer & Nylon separation washer
  • All “handrails” and top rails to be 32nb
  • Some situations where any standalone 1100mm high barriers are (Ie. Between canopy poles) could be 40nb top rail
  • No closure bend/stop starts on parallel deck rails, always ensure end to end in one complete run wherever practical
  • No handrails (AR150) to be attached to building cladding unless this is explicitly shown on plans/marked up drawings, AR10 (Stanchion mounted handrail) is the minimum requirement

Green Rule[edit]

For at least on end of the pipe, the sum of the tail and bend length (X+Y) must be at least 300mm, otherwise add 200mm green. Any tail (X) must be a minimum of 80mm, otherwise add 200mm green.