| Line 5: | Line 5: | ||
==Standard PS1 documentation== | ==Standard PS1 documentation== | ||
<div class="toccolours mw-collapsible"> | <div class="toccolours mw-collapsible mw-collapsed"> | ||
===Assistrail=== | ===Assistrail=== | ||
<div class="toccolours mw-collapsible"> | <div class="toccolours mw-collapsible"> | ||
| Line 12: | Line 12: | ||
[[File:PS1-AR-2.png|frameless|1000px]] | [[File:PS1-AR-2.png|frameless|1000px]] | ||
</div> | </div> | ||
===Tuffrail=== | |||
<div class="toccolours mw-collapsible"> | <div class="toccolours mw-collapsible"> | ||
[[File:PS1-TR-1.png|frameless|1000px]] | [[File:PS1-TR-1.png|frameless|1000px]] | ||
[[File:PS1-TR-2.png|frameless|1000px]] | [[File:PS1-TR-2.png|frameless|1000px]] | ||
</div> | </div> | ||
===Conectabal=== | |||
<div class="toccolours mw-collapsible"> | <div class="toccolours mw-collapsible"> | ||
[[File:PS1-CB-1.png|frameless|1000px]] | [[File:PS1-CB-1.png|frameless|1000px]] | ||
[[File:PS1-CB-2.png|frameless|1000px]] | [[File:PS1-CB-2.png|frameless|1000px]] | ||
| Line 26: | Line 26: | ||
[[File:PS1-CB-4.png|frameless|1000px]] | [[File:PS1-CB-4.png|frameless|1000px]] | ||
</div> | </div> | ||
===Bikesafe=== | |||
<div class="toccolours mw-collapsible"> | <div class="toccolours mw-collapsible"> | ||
[[File:PS1-BS-1.png|frameless|1000px]] | [[File:PS1-BS-1.png|frameless|1000px]] | ||
[[File:PS1-BS-2.png|frameless|1000px]] | [[File:PS1-BS-2.png|frameless|1000px]] | ||
[[File:PS1-BS-3.png|frameless|1000px]] | [[File:PS1-BS-3.png|frameless|1000px]] | ||
</div> | </div> | ||
===Kliptread=== | |||
<div class="toccolours mw-collapsible"> | |||
[[File:PS1-KT-1.png|frameless|1000px]] | |||
</div> | |||
</div> | </div> | ||
=MOE Type Work Design Intent/Shop Drawings SOP= | |||
Please ensure the following points are reviewed & adhered to when reviewing MOE Type Shop drawings designs, anything not inline with these SOP’s please have Drafting team revise prior sending DI for client approval. | |||
*4 hole baseplates by default unless told otherwise | |||
*No Chemical Anchors-only use HDG 12mm screw bolt for concrete fixings | |||
*75mm concrete edge distance will always be achievable onsite unless specifically stated meaning we can use Concrete screws unless reduced edge distance(50mm) is required | |||
*Stainless Steel 180mm Coach screws in all timber areas with SS washer & Nylon separation washer | |||
*All “handrails” and top rails to be 32nb | |||
*Some situations where any standalone 1100mm high barriers are (Ie. Between canopy poles) could be 40nb top rail | |||
*No closure bend/stop starts on parallel deck rails, always ensure end to end in one complete run wherever practical | |||
*No handrails (AR150) to be attached to building cladding unless this is explicitly shown on plans/marked up drawings, AR10 (Stanchion mounted handrail) is the minimum requirement | |||
=Green Rule= | =Green Rule= | ||
For at least on end of the pipe, the sum of the tail and bend length (X+Y) must be at least 300mm, otherwise add 200mm green. Any tail (X) must be a minimum of 80mm, otherwise add 200mm green. | |||
[[File:NZGREEN.png|200px]] | |||
Latest revision as of 22:33, 10 December 2025
PS1 Documentation[edit]
An PS1 is an engineering document that's required for all Moddex Product for New Zealand. There are PS1's available to view on the NZ One Drive, or in some cases a specific PS1 is made for an project.
Should you require a PS1 for a project, it will be mentioned in the original handover
Standard PS1 documentation[edit]
MOE Type Work Design Intent/Shop Drawings SOP[edit]
Please ensure the following points are reviewed & adhered to when reviewing MOE Type Shop drawings designs, anything not inline with these SOP’s please have Drafting team revise prior sending DI for client approval.
- 4 hole baseplates by default unless told otherwise
- No Chemical Anchors-only use HDG 12mm screw bolt for concrete fixings
- 75mm concrete edge distance will always be achievable onsite unless specifically stated meaning we can use Concrete screws unless reduced edge distance(50mm) is required
- Stainless Steel 180mm Coach screws in all timber areas with SS washer & Nylon separation washer
- All “handrails” and top rails to be 32nb
- Some situations where any standalone 1100mm high barriers are (Ie. Between canopy poles) could be 40nb top rail
- No closure bend/stop starts on parallel deck rails, always ensure end to end in one complete run wherever practical
- No handrails (AR150) to be attached to building cladding unless this is explicitly shown on plans/marked up drawings, AR10 (Stanchion mounted handrail) is the minimum requirement
Green Rule[edit]
For at least on end of the pipe, the sum of the tail and bend length (X+Y) must be at least 300mm, otherwise add 200mm green. Any tail (X) must be a minimum of 80mm, otherwise add 200mm green.