Moddex Design Coordinator Process: Difference between revisions
IainSimpson (talk | contribs) |
IainSimpson (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
=Receiving the Project= | =Receiving the Project= | ||
Before the project reaches CAD, it will be entered into the Projects board in Monday.com. | Before the project reaches CAD, it will be entered by the Projects team into the Projects board in Monday.com. From there, the project manager will assign it on to the CAD department, this will place an entry into the Design_New board. |
Revision as of 04:27, 16 June 2025
Receiving the Project
Before the project reaches CAD, it will be entered by the Projects team into the Projects board in Monday.com. From there, the project manager will assign it on to the CAD department, this will place an entry into the Design_New board.