Job Categories: Difference between revisions
IainSimpson (talk | contribs) No edit summary |
IainSimpson (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
==Moddex Job Categories== | ==Moddex Job Categories== | ||
AS OF 20th AUGUST 2025, JOB CATEGORIES HAVE NOW BEEN SUPERSEDED BY THE IMPLEMENTATION OF 5 SPEED. | **AS OF 20th AUGUST 2025, JOB CATEGORIES HAVE NOW BEEN SUPERSEDED BY THE IMPLEMENTATION OF 5 SPEED.** | ||
5 SPEED IS STILL IN THE EARLY STAGES, DETAILS ON THIS CHANGE IN PROCESS WILL BE UPLOADED ONCE REFINEMENTS HAVE BEEN MADE. | **5 SPEED IS STILL IN THE EARLY STAGES, DETAILS ON THIS CHANGE IN PROCESS WILL BE UPLOADED ONCE REFINEMENTS HAVE BEEN MADE.** | ||
{| class="wikitable" style="text-align: center; margin:auto" | {| class="wikitable" style="text-align: center; margin:auto" | ||
Revision as of 04:01, 27 August 2025
Moddex Job Categories
- AS OF 20th AUGUST 2025, JOB CATEGORIES HAVE NOW BEEN SUPERSEDED BY THE IMPLEMENTATION OF 5 SPEED.**
- 5 SPEED IS STILL IN THE EARLY STAGES, DETAILS ON THIS CHANGE IN PROCESS WILL BE UPLOADED ONCE REFINEMENTS HAVE BEEN MADE.**
| MODDEX JOB CATEGORIES | |||
|---|---|---|---|
| CATEGORIES | DETAILS | DESIGN (DI Leadtime) | PRODUCTION |
| CAT 1 | BOM - Job Picked off the shelf stock items (including pre-assembled stanchions) | 2 | |
| CAT 2 | BOM - Items picked, custom bent pipe (inhouse) and assembled to order (no custom fab) up to 30k | 3 | |
| CAT 2d | As Above - With Design, including standard Ezbilt ramps (base only) | 2* | 6 |
| CAT 3 | BOM - Items picked, custom bent pipe (inhouse) and assembled to order (no custom fab) Over 30k | 3* | 8 |
| CAT 3d | As Above - With Design | 4* | 8 |
| CAT 4d | Job requiring rolled pipe, custom fab & galvanising/coating up to 30k - With Design | 5* | 10 |
| CAT 5d | Job requiring custom fab & galvanising/coating over 30k - With Design | 7* | 12 |
| CAT 6d | Fully Fabricated products requiring subcontract manufacture, laser cutting & galvanising/coating - With Design, Example AS5100, EFSG - up to 80k | 10* | 25 |
CAT 6d over $80k, to be discussed with a project manager
Please note: These leadtimes are based on jobs being able to be released to Design & Production, where nothing can prevent the work being undertaken (missing details, not enough information, payment/accounts issue etc)