Ezibilt: Difference between revisions

From Design Academy Wiki
 
(64 intermediate revisions by 2 users not shown)
Line 1: Line 1:
The <strong>Moddex Ezibilt™ Ramp, Stair & Walkway System</strong> is the ultimate pre-engineered, offsite manufactured solution for fast-tracked and compliant construction of accessibility ramps & stairs. Ezibilt is designed to be form fitting, easy to assemble and has the option for relocation if necessary.  
The <strong>Moddex Ezibilt™ Ramp, Stair & Walkway System</strong> is the ultimate pre-engineered, offsite manufactured solution for fast-tracked and compliant construction of accessibility ramps & stairs. Ezibilt is designed to be form fitting, easy to assemble and has the option for relocation if necessary.  


*[https://moddex.sharepoint.com/sites/General/Shared%20Documents/Forms/AllItems.aspx?id=%2Fsites%2FGeneral%2FShared%20Documents%2FGeneral%2FMarketing%20Hub%2FSpecification%20Sheets%2FEzibilt%2FMDX%5FEzibilt%20Overview%20Brochure%2Epdf&viewid=91da7bb1%2D8b40%2D40b5%2D904d%2D1586408551a7&parent=%2Fsites%2FGeneral%2FShared%20Documents%2FGeneral%2FMarketing%20Hub%2FSpecification%20Sheets%2FEzibilt Overview Brochure]
=Product Updates=
*(30/06/2025) Please keep the orientation for fabricated beams the same between the fabrication drawings & the productions drawings.


=Range of Products=
*(19/06/2025) For mounting stairs onto side beams, please detail the hole positions on the side beam. The beam will remain standard with the additional holes noted on the PDs.
There are 3 different products in the <strong>Ezibilt</strong> family.


'''Platform'''
*(11/06/2025) Need to allow for 100° Door Swing for All Ezibilt Jobs that run up against a door
*(10/06/2025) Please refer to the following link for Ezibilt Standards. [http://20.211.196.52:8080/index.php/Austrailan_Standards#Ezibilt_Standards Ezibilt Standards]


*[https://moddex.sharepoint.com/sites/General/Shared%20Documents/General/Marketing%20Hub/Specification%20Sheets/Ezibilt/MDX_Specifications%20Doc_Ezibilt_AU.pdf?CT=1709789269259&OR=ItemsView Platform]
*(06/06/2025) Please use FX34623.14G.075 "Bugle Batten Screw, Type 17, 14g x 75mm - HDG" for attaching FRP to Ezibilt.


'''Ramp'''
*(14/05/2025) Now include fixings and fixing locations for tapered beam ground connection pieces (MD892's). Also apply this to the metal tips when used. [[File:Tapered Beam Detailing.png]]


*[https://moddex.sharepoint.com/sites/General/Shared%20Documents/General/Marketing%20Hub/Specification%20Sheets/Ezibilt/MDX_Specifications%20Doc_Ezibilt_AU.pdf?CT=1709789269259&OR=ItemsView Ramp]
*(16/04/2025) Platform bracing max angle 60°. Require layered support if over this value.


* [https://moddex.sharepoint.com/:p:/s/General/EXbAaYqilipIskYwJGe7wQwBig6vgd11sQdQo1IIqHGb4g?e=cac26r Introduction to Ramps]
*(16/04/2025) Stair Brace Required when Stair Span is greater than 350mm or Stringer Length is greater than 4000mm.


'''Stair'''
*(24/02/2025) We can use the following design for stairs on platforms. Utilise Blind Bolts. [[File:EB_Stair.png]]
 
*(20/01/2025) Moving forward we need to add extra detail to our Dis & Install drawings for Ezibilt regarding the concrete ramp tip. The customer pours that slab for us to mount on & the ramp tip is poured by our installers. We need to always have the below few points on the drawing.
[[File:EB_Pour.png]]
 
1. Posts on the ramp tip to be inground 250mm
 
2. Ramp tip to be 150mm thick at it’s lowest side
 
3. Ramp tip & concrete to be shaded but different colours to make it obvious
 
4. Notes on the drawing stating who is pouring what
 
a. Moddex to pour ramp tip
 
b. Customer to pour concrete for footings
 
5. Dimensions from a datum showing where the tip is located
 
*(26/09/2024) Linked component file updated to use the latest pieces and remove some invalid components. New MD851 to be used as the angled piece due. Works from flat-down. Needs to be inverted for flat-up. Align the construction lines generated when using the component. Removes the angled tread support joiner due to the gap being significantly less. 3490-2050 now added automatically for variable widths.
 
*(25/09/2024) Floor layout tool preset for Ekodeck created. Tool is simple to use. Use contextual menu for board rotation.
 
* (25/09/2024) There is now a Leg Assembly and Welded Leg Assembly tools. Use them as appropriate and the codes should now be correct.


=Key Features=  
=Key Features=  
Line 30: Line 56:
=Compliance=
=Compliance=
Ezibilt is designed and manufactured in accordance with [[Austrailan_Standards | Australian Standard]] AS 1428.1-2021 and relevant statutory WHS Codes of Practice/Guidelines.
Ezibilt is designed and manufactured in accordance with [[Austrailan_Standards | Australian Standard]] AS 1428.1-2021 and relevant statutory WHS Codes of Practice/Guidelines.
VSBA Compliance applies to all VSBA Primary School Projects. This includes a max 325mm tread support spacing & the use of 3582 stair stringers. This is accompanied by 32NB pipe & the associated standards.


=Training Material=
=Training Material=


====Introduction to Ezibilt Ramps====
====Introduction to Ezibilt Ramps====
* [https://moddex.sharepoint.com/:b:/s/General/ERUBlcifjBxFjF5Itoxdj1UBUgN5TX8vcDW5ya4gVmoHQg?e=BOXPJx 1. Introduction To Ezibilt Ramps]
* [https://moddex.sharepoint.com/:b:/s/General/ETQunbt76DdFhIuo9nHL4KkBb0kmYxTSujaQkKQXhiZ5iA?e=igv7XE Introduction To Ezibilt]
* [https://moddex.sharepoint.com/:b:/s/General/EYQuo3aywwJGpBOpFwsEEaQBormKbnvwAWQ9z5yq7tKyJg?e=PbA8BM 2. Ramps, The Basics]
* [https://moddex.sharepoint.com/:b:/s/General/EfyNhKkQh1BEinju7j_mHWwBbpplxGFf5U_jti169S55iA?e=sBhhUg Standard Ezibilt Configurations]
* [https://moddex.sharepoint.com/:b:/s/General/ESBkIANKhU9PnAFCOsOqf2EBmiEYJJR9AGWaS818XPtI3A?e=kKhl5W 3. Ramp Mounting]
* [https://moddex.sharepoint.com/:b:/s/General/ERNwTeVULBZOqSYK_g7xygQBeyyv1T68s3pWXfWFfTd6Uw?e=gaOvbq Ezibilt Design Principles]
* [https://moddex.sharepoint.com/:b:/s/General/EWJ_l_XUnRVJkIu7HD2IX6EB9HC2uPzoZ3TzPUK05rQh8Q?e=TCIT9k 4. Ramp Fittings]


====Ezibilt Ramp Design Process====
===Ezibilt Information===
* [https://moddex.sharepoint.com/:b:/s/General/EaHStmVsmLlDggUTDONaPFMBQr8lxCGB7nr_iDMDkEsKrw?e=tXTt2P 5. How To Make YOUR Ramp]
* [https://moddex.sharepoint.com/:f:/s/General/Eo29w9oMKRNBnED21B2hfTEB98Ep6qV16O2zyWGeMH_4iA?e=Ci9cfY Platform Kits]
* [https://moddex.sharepoint.com/:b:/s/General/EceUqO586thBv5mQSKJCbZYBCA05Rh8TdEh_NZvGWByMow?e=MPllCa 6. Build THEIR Ramp]
* [https://moddex.sharepoint.com/:f:/s/General/Ej5lvML0rsFMjuic2tW7Q3wBrNnJpOX6CsDYL6-u9HQgDA?e=ZsPAZ4 Master Parts Folder]
* [https://moddex.sharepoint.com/:b:/s/General/EVy2KLfiAqRFhJ3x5zBBPmAB2zMqj-eVrIjQseIXvrYufA?e=a3SRO5 7. The Power of Modularity]
* [https://web.edapp.com/course/66fde680c6553a63daa0babc EdApp Content]
* [https://moddex.sharepoint.com/:b:/s/General/EXxpoNT9kz5JoFTGItncp6ABOcdF4APxD1HbtNr4RAFjrA?e=hXdGOT 8. Engineer Drawings]
* [https://moddex.sharepoint.com/:b:/s/General/Ec5Plif6meZPpkwmC_GNEFABlM0Pl44Jns31pFhISIAXbg?e=tmJySk 9. Custom Platforms]
* [https://moddex.sharepoint.com/:b:/s/General/Eaa0oT2XuZlHln0aN1I6bckB4O8maDzhptuZIZ5BEH4Eyw?e=kBEfw1 10. Bracing & Cladding]
* [https://moddex.sharepoint.com/:b:/s/General/EVEHZfTb2dJIjImIkPQ7URIBGC4X2bF1dBOzKA17G_uuXg?e=uxKmU4 11. Handrail Design]
* [https://moddex.sharepoint.com/:b:/s/General/ERwQm_PAAg1HiDM8T4Ex8FIB9Ej4ui8k73o-PGzPYEIzBw?e=sMZLYt 12. DI Creation]
* [https://moddex.sharepoint.com/:b:/s/General/ESy6ljnkXW5DrcSFC1sV1n0BniC_rH9IsxLmtfg-e0V-5w?e=AtOXjr 13. PD Preparation]


===="HOW TO" Series====
====Ezibilt Ramp Model Process====
* [https://moddex.sharepoint.com/:v:/s/General/EU9qVSscOBZNq6INnmtJEf0BvLNm_SD0OOrmJ3FYPinyFg?e=rPC1yY HOW TO Place a ramp piece & angle it]
* [https://moddex.sharepoint.com/:b:/s/General/ESGLbXsBbbtPlCmJmtIkNRQB8QOmpnI5Jcbdpyk6Dq4gEA?e=KuyEyd Phase Manager with Ezibilt]
* [https://moddex.sharepoint.com/:v:/s/General/EQViCdMpvaBGhW9xuEHGMLwBgNOP8W9GJOU8AXoHYByVkg?e=Cb0a7r HOW TO Place an end beam]
* [https://moddex.sharepoint.com/:b:/s/General/ESN8xeChRMVLm-VsKPZLnIsB8i7ci3wVLYwfZ7-x9iH-NQ?e=yew8kC Ezibilt Fixings]
* [https://moddex.sharepoint.com/:v:/s/General/EQ4HDnvk-5VElG6KzmrG05ABhC9TiycmMl8XbB-PWKIRLg?e=gUccuE HOW TO Connect an end beam to a platform]
* [https://moddex.sharepoint.com/:b:/s/General/ER4lt8Jzo_hGrihe0DDdTQoB3E85jVmlrL6mGCkJp5OQ3g?e=wiwScD Ezibilt Decking & Cladding]
* [https://moddex.sharepoint.com/:v:/s/General/EVBtjnfIIs9Ch5hE1oeJz-YBRvlQgBs3xLXOCNHTjtzrRQ?e=XvyUXY HOW TO Connect inline platforms/ramps]
* [https://moddex.sharepoint.com/:b:/s/General/ERe0rz3AUhhLtTj_tlO3K18BIBZuksK9oIqfnp2Vqc-HtA?e=J2JRfu Ezibilt 180° Turns]
* [https://moddex.sharepoint.com/:v:/s/General/EZQZoR2cyGVIsCpr7FRIMYUBHYRPnCTBp0UkGnAZynEAkQ?e=FaFPEa HOW TO Connect angled platforms/ramps]
* [https://moddex.sharepoint.com/:b:/s/General/EUVwwOH4SI9Bn1bKXstc2wwBUlzR0ac9vRaoTSBqMB1R5A?e=weAWM2 Ezibilt 90° Turns]
* [https://moddex.sharepoint.com/:v:/s/General/EVIixTq-nSFEsi1o70se4JUBEG2G1O20iThDiVAK2jGWUw?e=32MgGY HOW TO Connect inline tread supports]
* [https://moddex.sharepoint.com/:b:/s/General/EZEKOuDOujxImBtd95zrpGkBQtH5oSRvAQUYK9Wt5PmGMA?e=Bl0mci Ezibilt Custom Pieces]
* [https://moddex.sharepoint.com/:v:/s/General/EdZL6QmPXwBCqalWD2h_HrEBOcHGBT3lrjV4dvFwXDQ0YQ?e=N8JoH1 HOW TO Connect angled tread supports]
* [https://moddex.sharepoint.com/:b:/s/General/ETWCAxcjnnhKqX21rGD4MioBizcTTUio1_YE2wFjtAdJvA?e=nYbawR Ezibilt & Handrails]
* [https://moddex.sharepoint.com/:v:/s/General/Ee4ugYfFvzBGgGct3dp-qLUBMzPkOUKqeOUH3YE2w3TSxg?e=npgNDd HOW TO Place legs]
 
* [https://moddex.sharepoint.com/:v:/s/General/EUWVXNlK_FRPv9hFCQyheO4B2pdQcKW6102-bUP0_bQxDg?e=qKTfb9 HOW TO Add bracing]
====Ezibilt Ramp DI Process====
* [https://moddex.sharepoint.com/:v:/s/General/ESigoBypc7NDgE7PpeQDyvABY3DRh9zvNHJtCp0MJH56UQ?e=iUA6rU HOW TO Add cladding mounts]
* [https://moddex.sharepoint.com/:b:/s/General/ESe50ZZyJaNPpnq_Trw2zOkBs6T0cRbJFvJy0h-jLagpoA?e=UrGeyv Ezibilt DI's]
* [https://moddex.sharepoint.com/:f:/s/General/EltrTPRfEchMiW-KEPd7EnUBjt24t765ZgkqNbEC2rhQnw?e=wGgLMc Example DI's]
 
====Ezibilt Ramp PD Process====
* [https://moddex.sharepoint.com/:b:/s/General/EWkq4Dmp7pBFinEXYkgH4iEBWURHnWxY-FZd0_m5R2BoMg?e=mku4Fj Ezibilt PD's Preparation]
* [https://moddex.sharepoint.com/:b:/s/General/Ef1NuEwnpH9An2rM2gpCKZUBGb_Ru_JkQ6yHu7qHty9eLg?e=HlWS4q Ezibilt ID Booklet]
* [https://moddex.sharepoint.com/:b:/s/General/EeMlnBY3ooRHhp0be0wey5UBd28TGhnpta26T672c9xBJw?e=q4KJJE Ezibilt PD Booklet]
* [https://moddex.sharepoint.com/:b:/s/General/EdErAcM1TjJKiQdOOkraEe0BO8MVlLlEUQ3BSeMY-u6Jvg?e=MmCWcj Ezibilt FD Booklet]
* [https://moddex.sharepoint.com/:b:/s/General/EeFWs6dxOX1LqQZR3wKHM5ABUTm8jdRwpGcgeLxYFQ7jEg?e=XbfwWC Ezibilt Pick & Pack]
* [https://moddex.sharepoint.com/:f:/s/General/EjYrstH6aDNLiMLDhZruIE8BYPy0CNHj6_Bc4I2rV0elRw?e=4LVsM5 Example PD's]
 
===Ezibilt Extras===
* [https://moddex.sharepoint.com/:b:/s/General/EYmwvzuU0ARCihq2gdo_NzUB50tl9LC2QEo2OsdvnDTYMg?e=cietjd Ezibilt FRP]


===="WHAT IS" Series====
===="WHAT IS" Series====
* [https://moddex.sharepoint.com/:b:/s/General/EZdZjrnMt41Koapmvr5qSdQBsrLzoh08fkcKWkbvRAQeQg?e=Os38OM WHAT IS 3480]
* [https://moddex.sharepoint.com/:f:/s/General/EnhyhjH9e5hOo-0OK6dtja8BQ-Nf1hWbx2caIS4mL5r4Ug?e=x4oW05 The Full "WHAT IS" series]
* [https://moddex.sharepoint.com/:b:/s/General/Eest3vZTfHRLppVTyTrV404Bmp6a9gu0djXpbc35QF70Bg?e=fkOsAs WHAT IS 3490]
 
* [https://moddex.sharepoint.com/:b:/s/General/EXkSdE2EvJFGg449IUImxsYBSgFJIPA64yg1e47SIxneRA?e=g4lbUq WHAT IS 3495]
===="HOW TO" Series====
* [https://moddex.sharepoint.com/:b:/s/General/EVPLYkcXquNDsh9s0wV50JoBd_jMSOh_90p1ge1Lqf--cg?e=L7uFdI WHAT IS MD848]
* [https://moddex.sharepoint.com/:f:/s/General/EklA-3KRkitHrwDzj5nryjsB_g0Wg9_X7ckBjXS_zm0mJg?e=4R7nje The Full "HOW TO" series]
* [https://moddex.sharepoint.com/:b:/s/General/ESDK0wKYMEFDhtGtWhQnTb4BZ1RC2qxT9BUgowIyuyml-A?e=BQnIfQ WHAT IS MD849]
* [https://moddex.sharepoint.com/:b:/s/General/EeUeOHTDhdRKqC35GMEOgSABm1j0pBgQEzkwVySSA2syJA?e=i8RBq8 WHAT IS MD850]
* [https://moddex.sharepoint.com/:b:/s/General/ESNtyMLx_dNNsU3U9YdP3h8B4cKFun0Or1bPU9TEQJSRSA?e=P2SeiA WHAT IS MD853]
* [https://moddex.sharepoint.com/:b:/s/General/Eeod0Pgc0idEqZlKk3bqthkBxaoYT-4QSsxsMb3lGC_dTQ?e=vq0Yay WHAT IS MD854]
* [https://moddex.sharepoint.com/:b:/s/General/EdX44LMsz4VJqvWNDfdqHesBOejJrpgbz3gc7hA0p8PtJQ?e=420w91 WHAT IS MD855]
* [https://moddex.sharepoint.com/:b:/s/General/Ec8HtDPTCR9GmQTllouyPt0B4wunxWtppyKK_4GBiJ_ejw?e=9nmaoM WHAT IS MD856]
* [https://moddex.sharepoint.com/:b:/s/General/EWs1lRhZ9ypMrFMtZSjlnO0B0AEzWC4zlM_0lbVAJblfBg?e=5E3y0g WHAT IS MD860]
* [https://moddex.sharepoint.com/:b:/s/General/EZQ0rWb1EHRMsOYbc5S9IhYBHAUDZXRT5z9uk0adqrTKKg?e=GRAI1A WHAT IS MD861]
* [https://moddex.sharepoint.com/:b:/s/General/EXsztcOhd5hItZjYZ4XOVSMBBMmYYITLo7ImsQRFUqsUCA?e=eDSMab WHAT IS MD862]
* [https://moddex.sharepoint.com/:b:/s/General/ER6zkoXAfcxAvSDi2X9iYSIB0skL7bGsaw1vqjHoN17yAg?e=4Az9Pv WHAT IS MD866]
* [https://moddex.sharepoint.com/:b:/s/General/EakFozq5ehtCpUD2vyOAZl4BX9I1k9S4icDiQEw4VCC-Zg?e=pjLVK5 WHAT IS MD867]
* [https://moddex.sharepoint.com/:b:/s/General/EUd73YZcyZVHvGrkI3K5s6wB8S8M1-gERLfw1M4CVH9boA?e=d1u6i1 WHAT IS MD871]
* [https://moddex.sharepoint.com/:b:/s/General/EcFZ6QOXq8ROqe75-UmOO9IBFd8zd5WkTCST10h_k-Z0EA?e=JUqP9F WHAT IS MD878]
* [https://moddex.sharepoint.com/:b:/s/General/EYljYuS0JzRAnwCVgBHqVFcBwnVlNJuDOipthwopceLy0Q?e=sILmfK WHAT IS MD882]

Latest revision as of 21:11, 23 July 2025

The Moddex Ezibilt™ Ramp, Stair & Walkway System is the ultimate pre-engineered, offsite manufactured solution for fast-tracked and compliant construction of accessibility ramps & stairs. Ezibilt is designed to be form fitting, easy to assemble and has the option for relocation if necessary.

Product Updates

  • (30/06/2025) Please keep the orientation for fabricated beams the same between the fabrication drawings & the productions drawings.
  • (19/06/2025) For mounting stairs onto side beams, please detail the hole positions on the side beam. The beam will remain standard with the additional holes noted on the PDs.
  • (11/06/2025) Need to allow for 100° Door Swing for All Ezibilt Jobs that run up against a door
  • (10/06/2025) Please refer to the following link for Ezibilt Standards. Ezibilt Standards
  • (06/06/2025) Please use FX34623.14G.075 "Bugle Batten Screw, Type 17, 14g x 75mm - HDG" for attaching FRP to Ezibilt.
  • (14/05/2025) Now include fixings and fixing locations for tapered beam ground connection pieces (MD892's). Also apply this to the metal tips when used.
  • (16/04/2025) Platform bracing max angle 60°. Require layered support if over this value.
  • (16/04/2025) Stair Brace Required when Stair Span is greater than 350mm or Stringer Length is greater than 4000mm.
  • (24/02/2025) We can use the following design for stairs on platforms. Utilise Blind Bolts.
  • (20/01/2025) Moving forward we need to add extra detail to our Dis & Install drawings for Ezibilt regarding the concrete ramp tip. The customer pours that slab for us to mount on & the ramp tip is poured by our installers. We need to always have the below few points on the drawing.

1. Posts on the ramp tip to be inground 250mm

2. Ramp tip to be 150mm thick at it’s lowest side

3. Ramp tip & concrete to be shaded but different colours to make it obvious

4. Notes on the drawing stating who is pouring what

a. Moddex to pour ramp tip

b. Customer to pour concrete for footings

5. Dimensions from a datum showing where the tip is located

  • (26/09/2024) Linked component file updated to use the latest pieces and remove some invalid components. New MD851 to be used as the angled piece due. Works from flat-down. Needs to be inverted for flat-up. Align the construction lines generated when using the component. Removes the angled tread support joiner due to the gap being significantly less. 3490-2050 now added automatically for variable widths.
  • (25/09/2024) Floor layout tool preset for Ekodeck created. Tool is simple to use. Use contextual menu for board rotation.
  • (25/09/2024) There is now a Leg Assembly and Welded Leg Assembly tools. Use them as appropriate and the codes should now be correct.

Key Features

  • Modular flexibility
  • No-weld assembly
  • Flat pack delivery
  • Reduced corrosion
  • Flexible cladding options
  • Relocatable
  • 50-year Design Life

Compliance

Ezibilt is designed and manufactured in accordance with Australian Standard AS 1428.1-2021 and relevant statutory WHS Codes of Practice/Guidelines.

VSBA Compliance applies to all VSBA Primary School Projects. This includes a max 325mm tread support spacing & the use of 3582 stair stringers. This is accompanied by 32NB pipe & the associated standards.

Training Material

Introduction to Ezibilt Ramps

Ezibilt Information

Ezibilt Ramp Model Process

Ezibilt Ramp DI Process

Ezibilt Ramp PD Process

Ezibilt Extras

"WHAT IS" Series

"HOW TO" Series